Phase 2 CHP Improvements
Design-Build
Project Overview
This project involved the installation of a second 375 kW Combined Heat & Power (CHP) Generator for the Kishwaukee Water Reclamation District.
Project Location
Kishwaukee Water Reclamation District, IL

Project Scope
By installing a second 375 kW Combined Heat & Power (CHP) Generator, the Kishwaukee Water Reclamation District was enabled to produce ~130% of its electricity needs via biogas from anaerobic digestion and produce enough thermal energy to heat KWRD’s anaerobic digesters via hot water. The CHP system included a sound enclosure, electrical connections, hot water heat exchanger, and associated hot water distribution system.
Services
- Installation of a second CHP Generator
Stats
- Project Type: Design-Build
- Location: Kishwaukee Water Reclamation District, IL
- Project Value: $1.2M