Village of Carol Stream Public Works Facility
Site Improvements
Project Overview
Overall there are
(15) material bins approximately 19′ high between the 2
sites. 9-11′ PCC Walls heavily reinforced with rebar with
another 9-11′ of lumber construction with hardie trim, 18″
I joists, heavy duty anchoring along with gutter systems
for the roofed bins. All the new material bins will act as
very-needed storage for the Public Works mulch, salt,
sand & gravel as the current bins have exceeded capacity.
Some of the bins with the newly constructed roofs will act
as storage for their larger equipment. Another important
aspect of the project is relocating the existing police
impound lot from the Public Works Facility over to the
new police impound adjacent to the WRC facility. The
new impound lot will have state-of-the-art surveillance
technology, a mini data center in the supplied cargo
container adjacent to the impound lot in which also act
as a storage container for the police. The impound will
be surrounded by 8′ tall fence with razor wire. At the
WRC facility, there was approximately 500lf of 18″ RCP
storm sewer installed to connect to an existing storm
system at the beginning of the property. This tie in will
help prevent the property flooding during large storm
events. Carol Stream has had issues with flooding in that
area previously. The main issue from the project was the
existing soil in which we had to construct the parking lots
and material bin areas. From 0′ to 4′ below existing grade
the soil was very hydric and contained a mix of sand,
topsoil and clay. Over 1,000cy had to be undercut and
replace with 3″ stone. The cut material was trucked to
the beginning of the site for a possible public sledding hill
or park.
Project Location
Carol Stream, IL
Project Scope
The FY23/24 Public Works & WRC
Exterior Site Improvements scope of work consists of
pavement improvements, new pavement areas, and
concrete retaining walls for material storage bins. All
open-air type storage bins with some locations with
wood framed roofs. Other improvements include new
site lighting, fencing and access gates.
Stats
- Project Type: Municipal / Cultural
- Location: Carol Stream, IL
- Owner: Village of Carol Stream Public Works
- Architect: Kluber Architects & Engineers
- Project Value: $3.8M